95
wood, bow and side ports fitted for closing with Screws
The Midships of the deck to be open and secured with iron bars the whole length of the deck 6 amidships tapering to 3 at bow and stern.
deck Ten hammock hooks to each cell, strong ladders fitted to upper deck on both decks.
2nd Deck. laid 7 feet below PL deck, beams of Manila hardwood & fret, deck 3 prime, stringer 8x4. as lower deck beams prime.
Eight cells fitted on each side, those of 12' & cuttles 18 x 18' ent in each cell under the stringer and secured as those of PL deck.
Two bowports and two stern ports 3×3 and filled with closing cut, iron gratinged ports as above, Two strong ladders to middle deck.
The ballast shifted and the ship thoroughly cleansed from the cleat to the Keelson, limbers cleared and three Coats of white wash on hold, first and second decks, the vessel Caulked from Copper to Copper decks inclusive.
Outside, upper deck and roof painted with two coats of dockyard yellow paint...
Fifty tons of clean Stone ballast put into the ship.
An imm rail fitted round Main...
95
wood, bow and side ports fitted for closing
with Screws
The Midships of the deck to be open and secured with iron bars the whole length
of the deck 6 amidships tapering to 3 at
bow and stern.
deck Ten hammock hooks to each cell,
Livo
strong
ladders fitted to upper
on
both decks.
2nd Deck. laid 7 feet below PL deck,
beams
of
Manila hardword & fret, deck
3 prime, stringer for
8x4.
as
lower deck beams prino
Eight cells fitted on each side
}
those of 12 dick & cuttles 18 x 18' ent
in each cell under
the
stringerand
secured as
these
of Pt deck
I wo
bewports
rts and two stern ports
3×3
and
filled with closing
cut, iron gratinged
ports
dick.
as
above, Two strong ladders to middle
The ballast shifted
and the ship
thoroughly cleansed from the cleak to the
Keelson, limbers cleared and three Conto
of
put
m
hold, first and
white wash seand decks, the bessel Caulked from
Copper to Copper decks inclusive
Outside, upper deck and
and roof painted with two coats of dockyard yellow paint...
Fifty tons of clean Stone ballast
put into the ship
An imm rail fitted
round Main
No comments yet.