CO129-094 - Acting Governor Mercer - 1863 [11-10] — Page 98

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

95

wood, bow and side ports fitted for closing with Screws

The Midships of the deck to be open and secured with iron bars the whole length of the deck 6 amidships tapering to 3 at bow and stern.

deck Ten hammock hooks to each cell, strong ladders fitted to upper deck on both decks.

2nd Deck. laid 7 feet below PL deck, beams of Manila hardwood & fret, deck 3 prime, stringer 8x4. as lower deck beams prime.

Eight cells fitted on each side, those of 12' & cuttles 18 x 18' ent in each cell under the stringer and secured as those of PL deck.

Two bowports and two stern ports 3×3 and filled with closing cut, iron gratinged ports as above, Two strong ladders to middle deck.

The ballast shifted and the ship thoroughly cleansed from the cleat to the Keelson, limbers cleared and three Coats of white wash on hold, first and second decks, the vessel Caulked from Copper to Copper decks inclusive.

Outside, upper deck and roof painted with two coats of dockyard yellow paint...

Fifty tons of clean Stone ballast put into the ship.

An imm rail fitted round Main...

Edit History

2026-05-19 01:23:56 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
95 wood, bow and side ports fitted for closing with Screws The Midships of the deck to be open and secured with iron bars the whole length of the deck 6 amidships tapering to 3 at bow and stern. deck Ten hammock hooks to each cell, strong ladders fitted to upper deck on both decks. 2nd Deck. laid 7 feet below PL deck, beams of Manila hardwood & fret, deck 3 prime, stringer 8x4. as lower deck beams prime. Eight cells fitted on each side, those of 12' & cuttles 18 x 18' ent in each cell under the stringer and secured as those of PL deck. Two bowports and two stern ports 3×3 and filled with closing cut, iron gratinged ports as above, Two strong ladders to middle deck. The ballast shifted and the ship thoroughly cleansed from the cleat to the Keelson, limbers cleared and three Coats of white wash on hold, first and second decks, the vessel Caulked from Copper to Copper decks inclusive. Outside, upper deck and roof painted with two coats of dockyard yellow paint... Fifty tons of clean Stone ballast put into the ship. An imm rail fitted round Main...
Baseline (Original)
95 wood, bow and side ports fitted for closing with Screws The Midships of the deck to be open and secured with iron bars the whole length of the deck 6 amidships tapering to 3 at bow and stern. deck Ten hammock hooks to each cell, Livo strong ladders fitted to upper on both decks. 2nd Deck. laid 7 feet below PL deck, beams of Manila hardword & fret, deck 3 prime, stringer for 8x4. as lower deck beams prino Eight cells fitted on each side } those of 12 dick & cuttles 18 x 18' ent in each cell under the stringerand secured as these of Pt deck I wo bewports rts and two stern ports 3×3 and filled with closing cut, iron gratinged ports dick. as above, Two strong ladders to middle The ballast shifted and the ship thoroughly cleansed from the cleak to the Keelson, limbers cleared and three Conto of put m hold, first and white wash seand decks, the bessel Caulked from Copper to Copper decks inclusive Outside, upper deck and and roof painted with two coats of dockyard yellow paint... Fifty tons of clean Stone ballast put into the ship An imm rail fitted round Main
2026-05-19 01:23:56 · Baseline
View content

95

wood, bow and side ports fitted for closing

with Screws

The Midships of the deck to be open and secured with iron bars the whole length

of the deck 6 amidships tapering to 3 at

bow and stern.

deck Ten hammock hooks to each cell,

Livo

strong

ladders fitted to upper

on

both decks.

2nd Deck. laid 7 feet below PL deck,

beams

of

Manila hardword & fret, deck

3 prime, stringer for

8x4.

as

lower deck beams prino

Eight cells fitted on each side

}

those of 12 dick & cuttles 18 x 18' ent

in each cell under

the

stringerand

secured as

these

of Pt deck

I wo

bewports

rts and two stern ports

3×3

and

filled with closing

cut, iron gratinged

ports

dick.

as

above, Two strong ladders to middle

The ballast shifted

and the ship

thoroughly cleansed from the cleak to the

Keelson, limbers cleared and three Conto

of

put

m

hold, first and

white wash seand decks, the bessel Caulked from

Copper to Copper decks inclusive

Outside, upper deck and

and roof painted with two coats of dockyard yellow paint...

Fifty tons of clean Stone ballast

put into the ship

An imm rail fitted

round Main

Comments

Approved members can add comments, bookmarks, and private notes.

No comments yet.

Private Research Note

Private notes are available after approval.